[Home] [Board of Trustees] [Departments] [Committees & Boards] [Municipal Code] [Visitor Information] [Contact Us]

Water & Wastewater

System Overview

Consumer Cofidence Report

Water and Sewer Rates

News

March 2006   Mesilla Reduces Water Pressure

    For years the Mesilla water system’s pressure reducing valve (PRV) had been failing. The valve was not operating properly and consequently the pressure throughout town was climbing. Pressure had peaked at 100 psi

    Two weeks ago the town replaced the valve and we have reduced our pressure to a more normal rage of 75 psi. Residents should be able to notice a difference in pressure.

April 2006   New Software System Almost Here

    We will soon be installing our new billing software. Implementation of the software will begin in late March and should be online by mid April. Residents and customers will soon see the benefits by being able to pay their water bills online, having access to their accounts online, being able to pay with credit cards, and we will have “automatic bank draft” available.

August 2005   Water and Wastewater Projects

    The Mesilla Public Works Department is currently in the proces of overseeing approximetely 1 million dollars in improvements to the water and wastewater systems. Design and enginering was awarded to Molzen-Corbin and Associats and work was awarded to Burn Construction Company of Las Cruces.

    Improvemtns include the following;

    1. Extension of waterlines on Glass Road, Union Ave., Estrada Road, Calle Oeste, Calle Guadalupe and Paisano Road.

    2. Installation of 8 inch sewer collection line on Callejon Guerra and Calle Guadalupe.

    3. Rehabilitaion of the town’s sewer lift station

    .

[Home] [Board of Trustees] [Departments] [Committees & Boards] [Municipal Code] [Visitor Information] [Contact Us]